What Is The Sequence Of Removing The Steel Support
Apr 20, 2022
1. Pre stress and remove the iron.
2. Lift the forklift into the pit to remove the prop.
3. First, remove the horizontal link, place the forklift in the center of the raised pillar, remove the bolts of the horizontal link, and then use the forklift to move the horizontal link to the side of the pit.
4. Remove the main support. In order to save the time for dismantling the steel support, lift the main steel support together with the forklift and crane to greatly improve the lifting weight. The length of the column is about 69 M. Through this disassembly, the support is removed in three parts, and the removed support is disassembled on the base plate.