Steel Support Installation Process Flow
Apr 23, 2022
When the subway foundation pit is excavated to the design depth, the survey team sets out the support position, processes the steel purlin outside the site, and welds the supporting bracket steel base plate with the drop plate on the steel purlin. The subway steel support with one end fixed and one end movable is assembled according to the width of the foundation pit. The length is temporarily determined according to the section width. Steel wedges are used for fine adjustment, and four stiffened plates are symmetrically welded on the lattice column along the line direction, According to the support position, weld on the lattice column along the forward direction of the line (40 double spliced channel steel, which is placed on 4 stiffened plates), chisel the surface of the enclosure pile structure within the support range as the support surface of the steel waist beam, and install the bracket.
Install the steel purlin and supporting bracket steel base plate, fill the gap between the steel waist beam and the enclosure pile with C20 concrete, lift the assembled steel support to the steel bracket with 25t crane or tower crane, so that the wide position of the movable end is supported on the steel base plate, and pad a hardwood wedge under the steel support, then fix the steel support with limit plate and limit bar, and apply prestress symmetrically along both sides of the support with two hydraulic jacks, The applied prestress is 0.6 times of the design axial force. After the pressure gauge is obviously attenuated, the steel wedge is used to lock the steel support.