1. Pole foundation:

When the scaffold is erected, it is required that the ground at the erection position must be flat and have a certain bearing capacity. At the same time, special drainage equipment is set to ensure that the base meets the standard requirements. Otherwise, it must be rectified according to the requirements. It can be formally erected only after the inspection meets the standard.

2. Scaffolding and building ties:

At the beginning of construction, the safety standard must be met. The distance between the wall connecting parts and the main node must be controlled within 30cm. At the same time, it should be set from the bottom floor. Note that if the scaffold height exceeds 24 meters, rigid connectors shall be used.

3. Scaffold bridging:

The cross bridging has horizontal and vertical differentiation, and it needs to be built in strict accordance with the safety standards, especially the lengthening of the rod, the connection of the inclined rod position and the frame body. In addition, the distance between scaffold poles should also meet the requirements of safety standards.


You Might Also Like