How to calculate the step length of scaffold erection

May 21, 2022

Before using scaffolds in construction, we need to know how to define the specific horizontal distance, step distance and vertical distance of scaffolds. This is related to its model. It is very helpful for us to understand these data. These data will affect the use of products. Before purchasing, the manufacturer will provide very detailed data to customers, and then we need to install them according to these data, The models of products purchased directly from the manufacturer have a standard distance. If it is too short or too long, it will affect the actual construction and use. Now let's introduce how to calculate the erection of scaffold through the erection of Suzhou steel pipe scaffold:

First of all, we should know that the definition standard of the horizontal distance, step distance and longitudinal distance of the scaffold is that the maximum vertical and horizontal spacing of the scaffold poles is 1.5m, and the pole extension must be butted. It is better to be about 3 to 5 cm in the form of overlap. In this way, when the scaffold is built, it will have a better bearing capacity in the summer vacation, and it is not easy to fracture. When selecting the long pole, we can refer to the requirements of scaffold erection; For the scaffold structure design, the structure must be safe and reliable, the cost must be reasonable, and it must be used under the specified conditions and within the specified period, and it must be able to fully meet the expected safety, durability and convenience in the construction process.

In the process of construction, the horizontal distance, step distance and longitudinal distance of the scaffold are defined as 1.5m between poles and 1.8m between steps. The operation layer is fully paved with 50 thick stamping steel scaffold board. The scaffold platform of the operation layer can not be less than 1.2m edge protection and a 18cm high inner side is fully hung with a dense safety net toe board. Single pole is adopted, the horizontal and vertical distance of pole is 1.5m, and the pole is 30cm away from the wall.

In the process of building construction, the various distances of scaffold erection are strictly controlled. The detailed definition can use the data parameters provided by Suzhou steel pipe scaffold erection. For general scaffolds, the horizontal distance, layout and vertical distance are selected according to their horizontal distance, and the step distance of other scaffolds is also determined according to this horizontal distance, Therefore, the horizontal distance is a very important factor. When selecting steel pipes and parts, we must first understand these data. The steel pipes and parts built by the scaffold can form single and double row scaffolds with different sizes, shapes and bearing capacities, support frames, support columns, material lifting frames, climbing scaffolds, cantilever frames and other multi-functional construction equipment, However, most of the ground scaffolds used as the main structure construction are fastener scaffolds, and the longitudinal distance of the scaffold poles is generally about one meter and five meters; The horizontal distance is generally about one meter.


You Might Also Like